Last additions - September/October 2009 |
Cork Roadbed.241 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.%886 %04, %2009
|
|
Concrete Retaining Wall234 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork%886 %04, %2009
|
|
Bachmann "MDT Plymouth"244 viewsHaving a quick spin on the now motorised turntable%886 %04, %2009
|
|
Concrete Retaining Wall263 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork%886 %04, %2009
|
|
Some Machinery257 viewsI have scratchbuilt some machinery (Generator) for inside the powerstation.%886 %04, %2009
|
|
My loco Roster269 viewsAll Bachmann: An MDT Plymouth (right), an H16-44 Fairbanks Morse (Left), and the new GE44T (Middle)
All have been converted to Microtrains couplers (The GE44T having converted since this photo was taken).%886 %04, %2009
|
|
Concrete Retaining Wall249 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork%886 %04, %2009
|
|
Concrete Retaining Wall347 viewsThe main body of a scalescenes Concrete Retaining Wall.%886 %04, %2009
|
|
|