|
Concrete Retaining Wall347 viewsThe main body of a scalescenes Concrete Retaining Wall.
|
|
Concrete Retaining Wall249 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
My loco Roster269 viewsAll Bachmann: An MDT Plymouth (right), an H16-44 Fairbanks Morse (Left), and the new GE44T (Middle)
All have been converted to Microtrains couplers (The GE44T having converted since this photo was taken).
|
|
Some Machinery257 viewsI have scratchbuilt some machinery (Generator) for inside the powerstation.
|
|
Concrete Retaining Wall264 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Bachmann "MDT Plymouth"244 viewsHaving a quick spin on the now motorised turntable
|
|
Concrete Retaining Wall235 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Cork Roadbed.241 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
Loco Roster on the Turntable260 viewsAll Bachmann: An MDT Plymouth (middle), an H16-44 Fairbanks Morse (Left), and the new GE44T (Right)
All have been converted to Microtrains couplers.
|
|
Cork Roadbed.233 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
An Overview of Progress230 viewsThe title says it all.
|
|
Cork Roadbed.249 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
Concrete Retaining Wall246 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Another stack.260 viewsI've added another chimney to the powerstation, this one for the smoke, the other two are cooling towers.
|
|
Concrete Retaining Wall265 viewsThe main body of a scalescenes Concrete Retaining Wall.
|
|
An Overview of Progress211 viewsThe title says it all.
|
|
Concrete Retaining Wall274 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
An Overview of Progress217 viewsThe title says it all.
|
|
An Overview of Progress213 viewsThe title says it all.
|
|
An Overview of Progress225 viewsThe title says it all.
|
|
|