Most viewed - Mine Layout: |
|
Areas Needing Major Work332 viewsBridge And River
|
|
|
|
Wiring331 viewsThe main bus wire, and block wires have been attached to the bottom of the layout. The track feeds will then be spliced onto the bus wires.
|
|
Turntable: Stage 11a331 viewsTurntable deck and end plates have been added.
|
|
|
|
|
Turntable: Stage 15327 viewsThe office/hut with roof installed on the bridge.
|
|
Turntable area326 viewsPlanned height of the turntable cut into the middle foam block
|
|
Turntable Test Run325 viewsRun directly off of a 9v battery, it will run alot slower when connected to my indexing circuit board.
|
|
Turntable: Stage 19325 viewsThe plastic people have teathered the arch on both sides to ensure it doesn't fall over again.
|
|
Areas Needing Major Work325 viewsRemovable Access section
|
|
Power Station323 viewsThe power station will be situated here. The foam has been cut to the depth of the hidden return line, and will have to be built up to the right level once the track is layed.
|
|
|
Rock Island Tree322 viewsI have added a little tree on Rock Island
|
|
|
|
Hidden Return line319 viewsA channel has been carved through the lower foam block and up into the middle foam block. This is where the hidden return line to take gondolas between the mine and powerstation will run.
|
|
429 files on 22 page(s) |
|
|
|
|
|
9 | |
|
|
|
|