Most viewed - Mine Layout: |
Power Station411 viewsSome general shots of progress
|
|
Hill Cut Back410 viewsThe hill has been cut back as I plan to replace the concrete retaining wall I had made with a wooden one as I believe it will fit better.
|
|
Site of the Miners camp410 viewsFuture sight of the miners camp
|
|
More holes filled409 viewsAnother hole in the layout has been filled. This rockface hides the expanding foam used to fill the gap above the hidden track
|
|
The Water Feed408 viewsLike on the tipple layout, the powerstation will have a water feed. This time it will come in above the extension/office area, and will be fed by the river (if it were real that is)
|
|
The Generator408 viewsThe powerstation has recieved a delivery from Carrol Island. The generator from the recently decomissioned Tipple Industrial Powerplant has been transported (by rail ^_^) to the Coal Mine.
|
|
Trestle Details408 viewsBolt holes have been added into the trestle to add detail to it.
|
|
Areas Needing Major Work408 viewsGroundwork, and possibly Mine entrance building
|
|
How its made 1: The foam407 viewsfirstly, expanding foam is squirted on and cut to an approximate mountain shape.
|
|
Areas Needing Major Work407 viewsGroundwork on the hill
|
|
Backscene406 viewsI found a panorama on Google, which I got printed out by a UK company called "LMS Printing". It is a single sheet of paper 100" long, which was printed well and for a resonable price.
It is currently covered with a layer of cling film to protect it whilst the layout is constructed. After the layout is built the clingfilm will be removed.
|
|
The small Weir405 viewsA weir was added to supply water to the kitchen and toilet blocks for the miners camp, which i am yet to add.
|
|
Turntable: Stage 2405 viewsTwo permenant beams have been fitted.
|
|
Lower Level Tunnel402 viewsThe tunnel on the lower level has had the face reworked such that there is a tunnel mouth perpendicular to the track rather than one at an odd angle.
|
|
Turntable: Stage 4402 viewsChecking that the Turntable Indexing System and Auto Reverser circuit board that I have designed will fit under the bridge.
|
|
The Generator400 viewsThe powerstation has recieved a delivery from Carrol Island. The generator from the recently decomissioned Tipple Industrial Powerplant has been transported (by rail ^_^) to the Coal Mine.
|
|
Incomplete Bridge400 viewsSome general shots of progress
|
|
Backscene399 viewsI found a panorama on Google, which I got printed out by a UK company called "LMS Printing". It is a single sheet of paper 100" long, which was printed well and for a resonable price.
It is currently covered with a layer of cling film to protect it whilst the layout is constructed. After the layout is built the clingfilm will be removed.
|
|
|
Trestle blended in397 viewsThe trestle has been blended in with the crused sandstone.
|
|