Most viewed - Mine Layout: |
Weathered Turntable274 viewsThe tuntable has been painted, weathered, and the well coated in a layer of sand, gravel and grass that simulates the buildup of dirt over time.
|
|
The Mine Passing Loop273 viewsThe mine passing loop was made using Peco Code 80 Set Track, which has been easily joined to the Code 55 Single Slip - as is the way with Peco Track, its why i like it so much.
|
|
On the Bridge273 viewsThe H16-44 wait to be serviced at the site of a locoshed/works, and the other siding is occupied by an hopper.
|
|
Undercoat271 viewsThe plastered area has recieved a black undercoat.
|
|
Turntable: Stage 16270 viewsThe centre arch. This will have ropes running from it to the base of the bridge for added detail. I will be using cotton thread for this job.
|
|
My loco Roster269 viewsAll Bachmann: An MDT Plymouth (right), an H16-44 Fairbanks Morse (Left), and the new GE44T (Middle)
All have been converted to Microtrains couplers (The GE44T having converted since this photo was taken).
|
|
Concrete Retaining Wall265 viewsThe main body of a scalescenes Concrete Retaining Wall.
|
|
The Bridge Top265 viewsSome more wood arrived, and I has able to build the top surface onto the bridge.
|
|
Undercoat263 viewsThe plastered area has recieved a black undercoat.
|
|
Concrete Retaining Wall263 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Loco Roster on the Turntable260 viewsAll Bachmann: An MDT Plymouth (middle), an H16-44 Fairbanks Morse (Left), and the new GE44T (Right)
All have been converted to Microtrains couplers.
|
|
Another stack.260 viewsI've added another chimney to the powerstation, this one for the smoke, the other two are cooling towers.
|
|
Some Machinery257 viewsI have scratchbuilt some machinery (Generator) for inside the powerstation.
|
|
|
Inspection Pit254 viewsI have moved the inspection pit so that it lines up perfectly with the turntable (no need for a short sharp curve).
|
|
|
Weathered Turntable252 viewsThe tuntable has been painted, weathered, and the well coated in a layer of sand, gravel and grass that simulates the buildup of dirt over time.
|
|
Concrete Retaining Wall249 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Cork Roadbed.249 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
|
429 files on 22 page(s) |
|
|
|
|
|
12 | |
|
|
|
|