Most viewed |
Powerstation in an Hill430 viewsThe Powerstation fitting in nicely with the hillside.
|
|
|
New Stairs429 viewsAn even closer shot of the staircase and path that leads to it.
|
|
Track and Trestle429 viewsAs the track comes up the hill it heads out over the trestle.
|
|
New Control Panel428 views
|
|
Backscene427 viewsI found a panorama on Google, which I got printed out by a UK company called "LMS Printing". It is a single sheet of paper 100" long, which was printed well and for a resonable price.
It is currently covered with a layer of cling film to protect it whilst the layout is constructed. After the layout is built the clingfilm will be removed.
|
|
Coaling Tower427 viewsA shot of the new large retaining wall beneath the coaling tower. The tower is likely to be replaced with a different one, but I am not sure yet. (If you have an oppinion on whether it should be kept, drop me a PM at AMR - {If you aren't a member of AMR: http://www.all-model-railroading.co.uk/forum/index.php?referrerid=2005}
|
|
Lower Rock Face.427 views
|
|
Lake in the Hills427 views
|
|
2nd Kit425 viewsThe second Faller kit is an oil tank to provide the deisel trains with fuel. This can be seen in the lower left corner.
|
|
|
The tunnel complete422 views
|
|
Waterfall422 viewsThe waterfall in the distance viewed from the substation.
|
|
New Stand420 viewsLast thing to do was to add a new stand and to hide the track and signal power cables.
|
|
The Decking420 viewsA closeup on the updates to the decking by the powerstation.
|
|
Rusting419 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Beginings of Gradients.418 viewsThe track has been blocked up to pull it to the correct gradients.
|
|
Coal Tipple418 viewsA bit of coal dust and rust have been added to the Coal tipple to stop it looking as plasticy. The roof still needs some work. Possible some felt roof effect sheet.
|
|
Motor Drive418 viewsThe threaded rod was then connected to a Motor i got at Maplin via a meccano chain and sprockets (The sprocket on the threaded rod was filed out of a washer by me)
|
|
Ballasting and Groundwork418 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover around the powestation.
|
|
1155 files on 58 page(s) |
|
|
|
|
|
9 | |
|
|
|
|