Most viewed |
|
Power Station496 viewsA new GreenMax Power station kit. It has been built, but still needs a coat of paint.
|
|
New Tree494 viewsAlso i have replaced the tree with a large new one to add to the scenic break.
|
|
Front Face493 viewsA Front facia has been installed and stained brown.
|
|
|
|
Plaster490 viewsThe hills smoothed with plaster and then scatter attached.
|
|
Another shot of the scenery488 viewsAnother shot from slightly further away, and a different angle.
|
|
|
Picknic Area485 viewsa close up on what turned out to be a successfull picknic area. There is a tent, toilet, and table/chairs.
|
|
Down into the tunnel485 viewsYou can just see through the details of the trestle into the lower tunnel entrance.
|
|
The Retaining Wall482 viewsthe wall has been fitted, and the trestle was built to rest on and against it.
|
|
360 Degree Panorama from the Cob481 views
|
|
About the layout479 viewsA Brief introdution to the layout.
|
|
Behind The Trees478 viewsThe trees will be a scenic break between the sawmill and the loggers shack.
|
|
The Hill Finished478 viewsAll the paper mache is finished and dry.
|
|
Trestle478 viewsI have finished the trestle which i have scratch built from balsa wood to fit the odly shaped bridge area.
|
|
Slate Quarry Panorama476 views
|
|
Water472 viewsI have painted on the water using acrylics. The layout is a quick one, so i havent bothered going to the effort of water effect products.
|
|
Track470 viewsCode 100 Hornby Flex bent to a 30cm dia circle.
|
|
1155 files on 58 page(s) |
|
|
|
|
6 | |
|
|
|
|
|