Most viewed |
An Overview of Progress186 viewsThe title says it all.
|
|
The Coaling Tower186 viewsIt towers high above the layout. Coal from the mine is dumped from cars in the rear tunnel. Its then transported up into the tower where it is crushed, and put into hoppers for delivery to the power plant, and the rest of the world
|
|
Hidden return line185 viewsThe hidden return line dissappears into a channel in the back of the middle foam block. I need to carve out the mine entrace withough breaking the edge of the channel.
|
|
Rear Yard185 viewsThe rear yard at the mine end has been cut out.
|
|
Rear yard185 viewsThe rear yard has been carved out, however will have to be raised - more about that later
|
|
Rear Yard185 viewsThe turntable end of the yard is being cut to the original design.
|
|
Profiles185 viewsSome shots of the gradients and track profiles
|
|
Profiles185 viewsSome shots of the gradients and track profiles
|
|
Rear Yard185 viewsThe profile of the rear yard has had to be changed as the turntable has been raised to allow for increased clearance requirements beneath it. The nails are height markers for the new surface which will be created with expanding foam.
|
|
Testing Clearances185 viewsI have had a bit of spare flex and some trucks out to test to make sure all the clearances of the many tunnels are sufficient. Here i was testing the return line as it runs under the passing loop.
|
|
Expanding Foam185 viewsI got some expanding foam and have been using it to glue foam parts together, fill in holes, and build up the rear yard. Here is the adaptions to the upper mine area.
|
|
Rear Yard185 viewsThe expanding foam has now been cut to shape using a saw. A very messy job, but it has resulted in a nice flat yard, meaning that trains won't roll away.
|
|
Turntable area.185 viewsThe turntable area has also been cut to the correct height and the expanding foam mostly cleaned up.
|
|
Plastering185 viewsThe right hand side has recieved a coat of plaster also. This plaster needs to be sanded smooth and will have another thin layer on top of it.
|
|
Lower Mine185 viewsThe lower mine entrance has been also cut to shape.
|
|
The Turntable185 viewsThe expanded foam here is now fully cleaned up. If you look at the back, you can see that the turntable level is in 2 peices, which have been fused together with expanding foam.
|
|
Hidden Return Line185 viewsA large cavity will be left under the hill to allow me to reach in through the large access hole to clear up derailments.
|
|
Front Hill Profile185 viewsThe wires show the profile of the hill at the front of the layout.
|
|
Front Facia185 viewsAn Hardboard facia has been cut out and fixed to the wooden frame.
|
|
Wooden Frame185 viewsA wood frame has been built and will be inlayed into the foam to both support it, and to give me something to attach the facia to.
|
|
1155 files on 58 page(s) |
|
|
|
|
|
48 | |
|
|
|
|