Most viewed |
Finished Plastering187 viewsThe remaining areas have been plasterd and are awaiting an undercoat.
|
|
|
|
|
|
|
|
|
|
Road Base187 viewsThe base colour for the road has been painted on.
|
|
Top section187 viewsThe removable top section has been made and slotted in position.
|
|
In position187 viewsHere we see how the foam block and hole in the powerstation line up with the hill formers behind.
|
|
Part of the Front Hill187 viewsI have done part of the front hill as it can be made without making track laying difficult.
|
|
And Now, Straight Through187 viewsThe track can now be layed straight through the powerstation to the hidden return line.
|
|
The New River Bed187 viewsThe upper river has had the same sand/stone mixture. The waterfall still needs doing though.
|
|
Some Scatters (Lower Level)187 viewsI have layed some scatters on the layout aswell.
This is the area around ther river. The colours here are more yellow to reprisent the sand around the river. I have added a rock here which has slowly weathered away to form a pillar.
|
|
An how to of laying Scatters187 viewsStage 3: Final covering
Step 1: Before the glue from the previous stage has dried, sprinkle on a thin final layer of scatter [You can add varying colours of scatter to the grassland]. This layer will soak up some of the glue from before and stick itself to the layout.
|
|
|
|
|
1155 files on 58 page(s) |
|
|
|
|
|
45 | |
|
|
|
|