Most viewed |
The ladder and fence are Painted249 viewsLast but not least for the "Early" pics, I have painted the ladder and fence. Definately plan to replace this ladder.
|
|
More Scenery Work249 viewsI have done a little more on the scenery, mainy I have replaced the level crossing.
|
|
Concrete Retaining Wall249 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Cork Roadbed.249 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
Chapel Inside248 viewsInside there are Pews and paintings and stained glass windows. You cah just see them through the door. There is also a light inside.
|
|
|
|
|
|
|
Concrete Retaining Wall246 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
|
The Mine Passing Loop245 viewsThe mine passing loop was made using Peco Code 80 Set Track, which has been easily joined to the Code 55 Single Slip - as is the way with Peco Track, its why i like it so much.
|
|
|
|
|
|
|
|
Bachmann "MDT Plymouth"244 viewsHaving a quick spin on the now motorised turntable
|
|
1155 files on 58 page(s) |
|
|
|
|
|
24 | |
|
|
|
|