Most viewed |
My loco Roster269 viewsAll Bachmann: An MDT Plymouth (right), an H16-44 Fairbanks Morse (Left), and the new GE44T (Middle)
All have been converted to Microtrains couplers (The GE44T having converted since this photo was taken).
|
|
And the scatter around the baseboard268 viewsTo cover up the horrible paper mache all the way around the baseboard, I decided to appy scatters. Worked pretty well i think.
|
|
|
|
Tipple Layout plan266 viewsThe track plan for the Tipple Industrial Complex layout.
|
|
|
|
Concrete Retaining Wall265 viewsThe main body of a scalescenes Concrete Retaining Wall.
|
|
The Bridge Top265 viewsSome more wood arrived, and I has able to build the top surface onto the bridge.
|
|
Train and Crane264 viewsThe crane has been glued in place on the layout, and I have also had the loco out for a test spin.
|
|
|
Undercoat263 viewsThe plastered area has recieved a black undercoat.
|
|
Concrete Retaining Wall263 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
|
|
New Road, and Wall261 viewsThe road has been relayed and a large retaining wall fitted. This wall will have brick effect sheet attached to it.
|
|
Basecoat260 viewsInitial green basecoat for everywhere but the river bed. That will be done in yellow
|
|
Bushes260 viewsSome plant life has been added to the hill in the form of bushes.
|
|
Loco Roster on the Turntable260 viewsAll Bachmann: An MDT Plymouth (middle), an H16-44 Fairbanks Morse (Left), and the new GE44T (Right)
All have been converted to Microtrains couplers.
|
|
Another stack.260 viewsI've added another chimney to the powerstation, this one for the smoke, the other two are cooling towers.
|
|
1155 files on 58 page(s) |
|
|
|
|
|
22 | |
|
|
|
|