Most viewed |
|
|
The Upper hill scatters dry389 viewsNow that the scatters are dry, I have taken some pictures. The colours have gone back to what they were before the glue darkened them. The natural light shows the colour variations that using multiple colours of scatters gives you
|
|
Generator387 viewsThe scratchbuilt generator has been salvaged from the last layout. It will be more visible in this layout as you can see it in through the doors and windows.
|
|
Lower hill sanded386 views
|
|
Ballasting on Side 2385 viewsThe track up the hill has been ballasted in.
|
|
How its made 4: Glue385 viewsusing a pippet, drop watered down glue (5:1 water to glue) gently and slowly at the top of the hill, slowly moving down. the glue will be drawn down into the sand and spread. You want it to look very wet with the watered down glue visible at the surface.
Sprinkle various colours of sand into rock strata.
Then sprinkle grass scatters, foliage, and or bushses if you wish. The glue on the surface will be slurped up by the extra sand and scatter. You shouldn't need to apply extra glue. Finished Pic. later.
|
|
Turntable: Stage 9b385 viewsAnother closup shot of the control office base.
|
|
Turntable: Stage 10385 viewsThe Indexing control board.
|
|
|
|
Turntable: Stage 13382 viewsConstruction of the control office/hut. This before the roof was added.
|
|
|
A New Bridge381 viewsThis replaces the old one so that there is way more room for some scenery.
|
|
Hill top381 viewsI have added a bit more scatter to the hill top.
|
|
Control Panel Track381 viewsTo control panel will have 4 tracks, one of which will double up as the programming track for an NCE PH-Pro controller.
|
|
Turntable: Stage 11b381 viewsTurntable deck and end plates have been added.
|
|
|
|
|
1155 files on 58 page(s) |
|
|
|
|
|
12 | |
|
|
|
|