Most viewed - November/December 2009 |
Ballasting and Groundwork828 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover between the tracks leaving the layout.
|
|
Rusting810 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Rusting583 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Current Progress Shots525 viewsJust a quick overview of current progress. The rest of the track has been bought and is currently in the post.
|
|
Ballasting and Groundwork503 viewsI have also ballasted the layed and painted track. In this shot, a view from the powerstation toward the layout.
|
|
Ballasting and Groundwork456 viewsI have also ballasted the layed and painted track. In this shot you can see the view that the train engineers see as they enter the layout.
|
|
Ballasting and Groundwork444 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover between the tracks leaving the layout.
|
|
5A monster Transformer435 viewsI got a transformer for £40 from Digitrains to power my NCE ProCab Starter set which I am getting for Christmas.
|
|
Current Progress Shots432 viewsJust a quick overview of current progress. The rest of the track has been bought and is currently in the post.
|
|
Powerstation in an Hill430 viewsThe Powerstation fitting in nicely with the hillside.
|
|
Backscene427 viewsI found a panorama on Google, which I got printed out by a UK company called "LMS Printing". It is a single sheet of paper 100" long, which was printed well and for a resonable price.
It is currently covered with a layer of cling film to protect it whilst the layout is constructed. After the layout is built the clingfilm will be removed.
|
|
Rusting419 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Ballasting and Groundwork418 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover around the powestation.
|
|
Hill Cut Back416 viewsThe hill has been cut back as I plan to replace the concrete retaining wall I had made with a wooden one as I believe it will fit better.
|
|
Hill Cut Back410 viewsThe hill has been cut back as I plan to replace the concrete retaining wall I had made with a wooden one as I believe it will fit better.
|
|
Backscene406 viewsI found a panorama on Google, which I got printed out by a UK company called "LMS Printing". It is a single sheet of paper 100" long, which was printed well and for a resonable price.
It is currently covered with a layer of cling film to protect it whilst the layout is constructed. After the layout is built the clingfilm will be removed.
|
|
Backscene399 viewsI found a panorama on Google, which I got printed out by a UK company called "LMS Printing". It is a single sheet of paper 100" long, which was printed well and for a resonable price.
It is currently covered with a layer of cling film to protect it whilst the layout is constructed. After the layout is built the clingfilm will be removed.
|
|
Wiring393 viewsThe main bus wire, and block wires have been attached to the bottom of the layout. The track feeds will then be spliced onto the bus wires. The pair of Bunched wires in this shot will go down into the Current Sense block detectors.
|
|
Generator387 viewsThe scratchbuilt generator has been salvaged from the last layout. It will be more visible in this layout as you can see it in through the doors and windows.
|
|
Control Panel Track381 viewsTo control panel will have 4 tracks, one of which will double up as the programming track for an NCE PH-Pro controller.
|
|
|