Most viewed - July 2008 |
The baseboard1410 viewsThis baseboard is a simple 50cm square peice of 12mm MDF
|
|
Removable top section517 viewsThe top of the hill will be removable so that i can clear up derailments. The start of the top section is in place.
|
|
Beginings of Gradients.418 viewsThe track has been blocked up to pull it to the correct gradients.
|
|
The tunnels417 viewsThere are two tunnel entrances, an upper and a lower one. There is also an hole for a coal tipple.
|
|
Side view402 viewsA side on view of how busy the layout is with tracks.
|
|
More of the hills.363 viewsI had planned to do the top section aswell in the packaging tape and card method. In fact I had mostly completed it when i realised there wasnt enough room for the trains.
|
|
The track356 viewsAs you can see, the track is a single line, but it loops around and around.
|
|
The Clearances324 viewsThere are very tight clearances as i have reduced the height as much as physically possible to reduce the gradients.
|
|
Another Track Shot238 viewsThis one take from an angle to give a sense of the gradients i will have to make.
|
|
Same again...221 views...only taken from the rear side of the hill.
|
|
The shorter Chassis219 viewsThe Chassis also had so be considerably shorter.
|
|
The new Hill.218 viewsThis one was made with solder wire and mod rock. This made it alot thinner, and so there was enough room.
|
|
Annie - only shorter216 viewsI have chopped up a Thomas the Tank carriage to make it an inch shorter so that it will navigate the steeeeeeeep gradients.
|
|
During a test run212 viewsBoth engine and carriage successfully navigated the loop under motor power,
|
|
Inside...212 viewsMy, what huge gradients you have. All the better to scare you with.
|
|
After a paint210 viewsThe carriage has been repainted, and the holes filled in.
|
|
Start of the lower hill.204 viewsThe bottom section is made of card and packing tape. This will then be modrocked.
|
|
Another Check rail204 viewsThere is also a check rail at the tightest Top loop to reduce the risk of derailing.
|
|
Completed hill203 viewsThe fully completed hill - without the removable top peice
|
|
Tape Hill199 viewsAs i said before, I completed the top of the hill as pictured, but then had to start again with the hill.
|
|
|