Image search results - "cat" |
The lower Tunnel298 viewsA shot of the lower tunnel and location of the trestle bridge.
|
|
Scatters303 viewsBefore fully dry, the plaster was scored to create rock strata. This was then drybrushed to create colour textures, and then scatters applyed on top.
|
|
Again from the rear277 viewsAnother shot of the back of the layout. This one after scatters were applied
|
|
Hill top381 viewsI have added a bit more scatter to the hill top.
|
|
Ballasting and Groundwork828 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover between the tracks leaving the layout.
|
|
Ballasting and Groundwork444 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover between the tracks leaving the layout.
|
|
Ballasting and Groundwork503 viewsI have also ballasted the layed and painted track. In this shot, a view from the powerstation toward the layout.
|
|
Ballasting and Groundwork417 viewsI have also ballasted the layed and painted track. In this shot you can see that i have also added some ground cover around the powestation.
|
|
Ballasting and Groundwork456 viewsI have also ballasted the layed and painted track. In this shot you can see the view that the train engineers see as they enter the layout.
|
|
ARGH!!!672 viewsSorry about that, not sure how I managed to upload that.
|
|
Left Hill827 viewsScatters added to the hill on the left hand side of the layout. The colours dont match because the glue is not dried - it usually takes 2 to 3 weeks to completely dry.
This is the result of my small tutorial shots.
|
|
Scatter809 viewsAll the scatters are now glued down onto the hill. The fences are also attached along with the dirt road having been painted.
|
|
Plaster490 viewsThe hills smoothed with plaster and then scatter attached.
|
|
Greenery692 viewsSome grass scatters spread in the forest area.
|
|
Track back down.976 viewsI had to take the track up to glue on the scatters, but its back on now.
|
|
Site Of the Saw Mill761 viewsThe location of where the sawmill will be.
|
|
New Track and Scenery999 viewsAfter the destruction of the scenery i had built before thanks to my cat, I have had to completely rebuild all of the forest. This time i have used plastic trees which cannot be squashed by my cat.
|
|
Some Scatters1067 viewsSome scenics have been applied.
|
|
Some paint.935 viewsThe mountain has been painted in its basecoat colours. scatters will be layed a top this paint.
|
|
The Evil One1381 viewsI was visited by the evil one while taking photos. Fortunatly she was too tired to try and jump up on (and try to destroy!) the layout.
|
|
|