Image search results - "Track" |
Ballasted Trestle.229 viewsI know normally a trestle wouldn't be balasted, but is was neccessary to help hold the track in place.
|
|
Track and Trestle429 viewsAs the track comes up the hill it heads out over the trestle.
|
|
Rusting810 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Rusting419 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Rusting583 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown
|
|
Current Progress Shots525 viewsJust a quick overview of current progress. The rest of the track has been bought and is currently in the post.
|
|
Current Progress Shots362 viewsJust a quick overview of current progress. The rest of the track has been bought and is currently in the post.
|
|
Current Progress Shots432 viewsJust a quick overview of current progress. The rest of the track has been bought and is currently in the post.
|
|
Control Panel Track381 viewsTo control panel will have 4 tracks, one of which will double up as the programming track for an NCE PH-Pro controller.
|
|
Final Track Plan180 viewsI have updated the track plan once more, l and am now happy with the way it looks.
|
|
The Track520 viewsOnce again i have bent the track to the correct size and shape.
|
|
Undercoat467 viewsThe completed undercoating. Yellow for the river, gray for the track, and green elsewhere.
|
|
The track356 viewsAs you can see, the track is a single line, but it loops around and around.
|
|
Ballasting499 viewsThe track being held down whilst ballast was applied.
|
|
Another Track Shot238 viewsThis one take from an angle to give a sense of the gradients i will have to make.
|
|
Track271 viewsA closeup on the track
|
|
Track470 viewsCode 100 Hornby Flex bent to a 30cm dia circle.
|
|
Track on Side 1432 viewsAll of the Fast tracks points are now built and fitted in place. I plan to use Solenoid point motors as the slow action ones are just tooooooo expensive.
|
|
Track188 viewsThe track up the hill. This is Peco Code-55. I will explain why in next months Photo collection,
|
|
Trackwork Edit500 viewsAn adaption to the trackwork. The FastTracks points (They are very good kits, excellent) were unfortunately unable to stand up to the massive strain of snap action point motors. As a result I have had to relay all the track - this time using Peco Code-55.
|
|
|