Last additions - Mine Layout: |
Profiles185 viewsSome shots of the gradients and track profiles%943 %22, %2009
|
|
Rear Yard Profile206 viewsThe entire yard is on a slope, which is far from idea, as all the trains will roll off onto the mainline.%943 %22, %2009
|
|
Hidden Return line216 viewsA channel has been carved through the lower foam block and up into the middle foam block. This is where the hidden return line to take gondolas between the mine and powerstation will run.%943 %22, %2009
|
|
New Turntable Height219 viewsHere is a chunk of foam that was added to brin this hill to the new height of the turntable.%943 %22, %2009
|
|
The River531 viewsThe river has been extended futher on into the layout.%943 %22, %2009
|
|
Hidden Return line221 viewsThe hidden return line.%943 %22, %2009
|
|
Profiles201 viewsSome shots of the gradients and track profiles%943 %22, %2009
|
|
Rear Yard185 viewsThe turntable end of the yard is being cut to the original design.%943 %22, %2009
|
|
Rear yard185 viewsThe rear yard has been carved out, however will have to be raised - more about that later%943 %22, %2009
|
|
Lower mine222 viewsThe access to the lower mine from the rear left side to clear up any derailments.%943 %22, %2009
|
|
Mine entrance189 viewsThe entrance has now been carved out of the main foam slab%943 %22, %2009
|
|
Rear Yard185 viewsThe rear yard at the mine end has been cut out.%943 %22, %2009
|
|
Rear Yard208 viewsHere the gradient up to the rear yard has been cut out to an approximate profile. This may need to change later. The cut needs to be extended on into the foam wall.%943 %22, %2009
|
|
Hidden return line185 viewsThe hidden return line dissappears into a channel in the back of the middle foam block. I need to carve out the mine entrace withough breaking the edge of the channel.%943 %22, %2009
|
|
Hidden Return line304 viewsA channel has been carved through the lower foam block and up into the middle foam block. This is where the hidden return line to take gondolas between the mine and powerstation will run.%943 %22, %2009
|
|
Inside the mine297 viewsHere will be located a passing loop for exchanging fulls and empties.%943 %22, %2009
|
|
Turntable/Miners Camp areas317 viewsThese levels are now correctly cut into the foam at the right depth. The foam is quite rough, so will need to be smoothed over with plaster.%943 %22, %2009
|
|
Mine Office's/Lower Mine301 viewsAnother shot of this area.%943 %22, %2009
|
|
Hidden Return line301 viewsA channel has been carved through the lower foam block and up into the middle foam block. This is where the hidden return line to take gondolas between the mine and powerstation will run. The scenery will be built up above this to allow the tracks in the passing loop to have somewhere to go.%943 %22, %2009
|
|
Mine Office's/Lower Mine303 viewsThe mine office's area track plan has been drawn on, but the foam is yet to be carved away.%943 %22, %2009
|
|
429 files on 22 page(s) |
|
|
|
|
|
|
|
|
|
21 |
|