Last additions - September 2010 |
Turntable: Stage 8b369 viewsA test fit to make sure that the bridge still fits %669 %02, %2010
|
|
Turntable: Stage 8358 viewsOne of the two chassis will be covered with wood. On top of this and at this end will be located the control office for the turntable%669 %02, %2010
|
|
Turntable: Stage 7b361 viewsAnd my heaviest loco placed on the track to ensure that it doesn't sag%669 %02, %2010
|
|
Turntable: Stage 7366 viewsCentral cross beams/supports have been added to prevent the track from sagging under the weight of a train%669 %02, %2010
|
|
Turntable: Stage 6374 viewsThe start of the side walls have been built. The rest of the walls from the current level to ground level will be made of strip wood.%669 %02, %2010
|
|
Turntable: Stage 5451 viewsThe Track has been fitted onto the two chassis.%669 %02, %2010
|
|
Turntable: Stage 4402 viewsChecking that the Turntable Indexing System and Auto Reverser circuit board that I have designed will fit under the bridge.%669 %02, %2010
|
|
Turntable: Stage 3415 viewsAnd the temporary one removed.%669 %02, %2010
|
|
Turntable: Stage 2405 viewsTwo permenant beams have been fitted.%669 %02, %2010
|
|
Turntable: Stage 1524 viewsTemporary beam to hold two chassis in the correct place.%669 %02, %2010
|
|
|
|
|