Last additions - Pre-Monthly 3 |
Rock Outcrop185 viewsThe outcrop is made by first nailing foam blocks together. These blocks are then glued with expanding foam, followed by being carved to shape.%944 %22, %2009
|
|
Rock Outcrop185 viewsThe outcrop is made by first nailing foam blocks together. These blocks are then glued with expanding foam, followed by being carved to shape.%944 %22, %2009
|
|
Upper Mine278 viewsA shot of where the rock out crop will cover the mine entrance and help to reshape the way that the mine and the yard entrance relate.%944 %22, %2009
|
|
Upper Waterfall185 viewsThe upper river and water fall have been carved out. the hole here is where the water will drop into and flow into an underground river. The river then joins to the front river through a culvert.%944 %22, %2009
|
|
Upper River185 viewsThe upper river and water fall have been carved out.%944 %22, %2009
|
|
Front Facia216 viewsAn Hardboard facia has been cut out and fixed to the wooden frame.%944 %22, %2009
|
|
Head Shunt Tunnel188 viewsThe head shunt tunnel has had the base of the tunnel built to finish it off. This has been glued in with expanding foam.%944 %22, %2009
|
|
Rock Outcrop186 viewsThere will be a rocky out crop which crosses from the hills in the rear to the one at the front. This will act as a scenic break.%944 %22, %2009
|
|
Upper River188 viewsThe upper river and water fall have been carved out.%944 %22, %2009
|
|
Upper River185 viewsThe upper river and water fall have been carved out.%944 %22, %2009
|
|
Front Facia185 viewsAn Hardboard facia has been cut out and fixed to the wooden frame.%944 %22, %2009
|
|
Front Facia185 viewsAn Hardboard facia has been cut out and fixed to the wooden frame. The height of the hill at the front is evident from the shape of the facia.%944 %22, %2009
|
|
Head Shunt197 viewsThe main head shunt runs right along the edge of the access hatch, hence the hatch was cut to a bizarre angle.%944 %22, %2009
|
|
Wooden Frame194 viewsA wood frame has been built and will be inlayed into the foam to both support it, and to give me something to attach the facia to.%944 %22, %2009
|
|
Wooden Frame185 viewsA wood frame has been built and will be inlayed into the foam to both support it, and to give me something to attach the facia to.%944 %22, %2009
|
|
Wooden Frame349 viewsA wood frame has been built and will be inlayed into the foam to both support it, and to give me something to attach the facia to.%944 %22, %2009
|
|
Front Facia185 viewsAn Hardboard facia has been cut out and fixed to the wooden frame.%944 %22, %2009
|
|
Access Hatch186 viewsThe scenery level has been built up to the correct height above the hidden return line.%944 %22, %2009
|
|
|
|
|