Turntable: Stage 1524 viewsTemporary beam to hold two chassis in the correct place.
|
|
Turntable: Stage 2405 viewsTwo permenant beams have been fitted.
|
|
Turntable: Stage 3415 viewsAnd the temporary one removed.
|
|
Turntable: Stage 4402 viewsChecking that the Turntable Indexing System and Auto Reverser circuit board that I have designed will fit under the bridge.
|
|
Turntable: Stage 5451 viewsThe Track has been fitted onto the two chassis.
|
|
Turntable: Stage 6374 viewsThe start of the side walls have been built. The rest of the walls from the current level to ground level will be made of strip wood.
|
|
Turntable: Stage 7366 viewsCentral cross beams/supports have been added to prevent the track from sagging under the weight of a train
|
|
Turntable: Stage 7b361 viewsAnd my heaviest loco placed on the track to ensure that it doesn't sag
|
|
Turntable: Stage 8358 viewsOne of the two chassis will be covered with wood. On top of this and at this end will be located the control office for the turntable
|
|
Turntable: Stage 8b369 viewsA test fit to make sure that the bridge still fits
|
|
Turntable: Stage 9a378 viewsThe base for the control office is completed.
|
|
Turntable Test Run325 viewsRun directly off of a 9v battery, it will run alot slower when connected to my indexing circuit board.
|
|
Turntable: Stage 9b385 viewsAnother closup shot of the control office base.
|
|
Turntable: Stage 10385 viewsThe Indexing control board.
|
|
Turntable: Stage 11a331 viewsTurntable deck and end plates have been added.
|
|
Turntable: Stage 11b381 viewsTurntable deck and end plates have been added.
|
|
Turntable: Stage 12380 viewsThe second end, which will be a ladder/staircase down to the pit from the bridge.
|
|
Turntable: Stage 13382 viewsConstruction of the control office/hut. This before the roof was added.
|
|
Turntable: Stage 14346 viewsThe office end close up.
|
|
Turntable: Stage 15327 viewsThe office/hut with roof installed on the bridge.
|
|
|