|
Final Track Plan180 viewsI have updated the track plan once more, l and am now happy with the way it looks.
|
|
Baseboard Side 2458 viewsThe second half of the baseboard is now out of the workshop and on my windowsill.
|
|
New Crossmember176 viewsThe profile of the hill was too steap, so i have had to build a peice of wood to replace the top of the crossmember to change its profile.
|
|
Track on Side 1432 viewsAll of the Fast tracks points are now built and fitted in place. I plan to use Solenoid point motors as the slow action ones are just tooooooo expensive.
|
|
Track on Side 2338 viewsAnother shot. This one from a birds eye view, showing how the track weaves down the hill.
|
|
Track on Side 2174 viewsThe Micro-Engineering Code 40 flex has been fitted to the hill.
|
|
Ballasting on Side 2385 viewsThe track up the hill has been ballasted in.
|
|
Ballasting on Side 2173 viewsAnother shot of the ballasting from a different angle. As you can see, the hill is quite steep.
|
|
The Tipple174 viewsI have purchased this Tipple off eBay. I thought it was a very good find, and was quite cheap too.
|
|
The Tipple In Position179 viewsThe Coaling tipple has been temporarily fittend to make sure that it fits well.
|
|
|
|
|